Yep, that's right. I think we're ACTUALLY going to finish our basement. This is, if the contractor doesn't give up on me and decide that I'll be too much of a pain in the butt to work with.
At this point, I've come up with 14 different floor plans for the basement. Luckily for him, I've only emailed him four of them. So here are SOME of the different floor plans I've come up with.
Plan 1: This was the ORIGINAL plan that we sent to the contractor. Simple, but the office isn't separated by a wall and I thought it might be nice for Doug to have his own computing space that I DIDN'T see. :)
Plan 2: I decided that this plan didn't use the space well AND I didn't like the random pole in the middle.
Plan 3: I sent this plan to the contractor and I really liked it because we had added a whole room and changed the old office in the upper right-hand corner to a library with built in shelving. But then I taped it out for Doug to see on the basement floor and he thought the section of the office closest to the bathroom was too small to make it into a room... and I kind of agreed with him begrudgingly. Sooo, back to the drawing board. I was worried that I was trying to do too much with the space we had, but the levels above the basement do more with the same amount of space, so I was determined to keep trying.
Plan 4: I really was liking this plan because it increased the size on the office and changed the entry of the food storage room so I wouldn't have to go into "Doug Territory" each time I needed an extra can of tomato sauce and such. It also had the added advantage of a big linen closet in between the storage and workroom. I didn't like the small entry way into the office, but it was doable. THEN we ended up going to Washington DC with my cousin and saw this amazing salt water aquarium display at the Museum of Natural History, so we needed an unfinished place for a tank. If Doug decides that he's not going to do a tank after all, I guess this plan could still be in the running.
Plan 5: I still like this plan, but I'm not sure what I would do with the 7x5 space in the middle of the basement, so I added it to the storage space in one of the final versions of the plan.
Plan 6 (above) and Plan 7 (below): I sent these last two plans to the contractor yesterday. I know that the ceiling is going to need to be lower in some places because of the central air ducts in the basement, so I'm not sure if I can place the bathroom where I did in plans 4, 5, and 6. I'm not sure if I like the little hallway in plan 7, but I do like the little linen closet off of the bathroom. Also, it won't be a problem having Doug's workroom right off of his office because he's the only one that will really use it. The one thing that I kind of don't like about either of these plans is that the door to our unfinished space is right in the middle of the basement. There's a part of me that thinks that the entrance to storage should be tucked away in a corner like in Plan 4.
Yep, so now I'm waiting for him to respond back to my email from yesterday. Usually he responds within a day, but he could be on vacation or something or just really busy on a job. One of the reasons we really like him was that he was easygoing, but very business-like.







